Kangaroo crane 2, EET, Port Koper
The machine was originally intended for unloading ships. The machine is upgraded with a transport line for the loading of ships.
| Project: | Redesign and reconstruction of kangaroo crane in loading and unloading machine in EET at the Port of Koper |
| Execution time: | Year 2004 |
| Role on Project: | Project management, control software and HMI software |
| The total investment cost: | 200.000 EUR |