Overall Equipment Effectiveness, OEE, Glassworks Hrastnik
In Steklarna Hrastnik we installed a system for the control of production in real time. System counts, during the production of the bottles, produced and waste bottles and calculates overall efficiency of the equipment SU = A (availability) x P (power) x Q (quality). Glassworks Hrastnik can note, already during the production, where are the reasons for the less efficient production and then improves efficiency, even during the production.
| Project: | Overall Equipment Effectiveness, OEE, Glassworks Hrastnik |
| Execution time: | Year 2016 |
| Role on Project: | Project coordination, production control software for the control of OEE |